当前位置:机电之家首页 >> 工程造价>> 常用范本 >> 工程进度款结算申请表 >> 基于sna 的工程项目进度管理研究 ——以上海d 项目为例
基于sna 的工程项目进度管理研究 ——以上海d 项目为例

相似文献/references:

[1]李民奎.工程管理学报,2008,(03):49.

li min-kui.the use of linear diagram in project progress management[j].journal of engineering management,2008,(01):49.

[2]赵振宇,吕乾雷.工程管理学报,2010,(05):559.

zhao zhen-yu,lv qian-lei.study on the double-buffering bbbbbb for project schedule control[j].journal of engineering management,2010,(01):559.

[3]卢 静,陆 彦,施 毅.工程管理学报,2012,(02):28.

lu jing,lu yan,shi yi.pip -based schedule management of multi-project portfolio of rail transit[j].journal of engineering management,2012,(01):28.

[4]贾广社,王 娟,杨芳军.工程管理学报,2013,(04):62.

jia guang-she,wang juan,yang fang-jun.social impact assessment of construction projectbased on social network analysis[j].journal of engineering management,2013,(01):62.

[5]王 琦,薛小龙,张立东.工程管理学报,2014,(02):22.

wang qi,xue xiao-long,zhang li-dong.construction innovation networks:absorptive capacity perspective[j].journal of engineering management,2014,(01):22.

[6]王广斌,沈慧敏,杨 洋,等.工程管理学报,2015,(01):7.[doi:10.13991/j.cnki.jem.2015.01.002]

wang guang-bin,shen hui-min,yang yang,et al.analysis of international bim rebbbbbb communities based on fast-greedy algorithm[j].journal of engineering management,2015,(01):7.[doi:10.13991/j.cnki.jem.2015.01.002]

[7]杨 青,苏振民,金少军,等.工程管理学报,2015,(03):110.[doi:10.13991/j.cnki.jem.2015.03.020]

yang qing,su zhen-min,jin shao-jun,et al.risk control system of construction project of integrated project delivery with social network analysis[j].journal of engineering management,2015,(01):110.[doi:10.13991/j.cnki.jem.2015.03.020]

[8]陈 甜,孙 峻,唐贵香,等.工程管理学报,2017,(02):12.[doi:10.13991/j.cnki.jem.2017.02.003]

chen tian,sun jun,tang gui-xiang,et al.effect of social network on safety knowledge disseminationamong construction workers[j].journal of engineering management,2017,(01):12.[doi:10.13991/j.cnki.jem.2017.02.003]

[9]王德东,李凯丽,徐友全.工程管理学报,2017,(05):68.[doi:10.13991/j.cnki.jem.2017.05.013]

wang de-dong,li kai-li,xu you-quan.a social network analysis of organizational relationshipin hospital construction projects[j].journal of engineering management,2017,(01):68.[doi:10.13991/j.cnki.jem.2017.05.013]

[10]孟宪薇,韩锡沙.工程管理学报,2018,(03):58.[doi:10.13991/j.cnki.jem.2018.03.011]

meng xian-wei,han xi-sha.rebbbbbb on financing risk of quasi operational ppp project basedon social network analysis bbbbbb[j].journal of engineering management,2018,(01):58.[doi:10.13991/j.cnki.jem.2018.03.011]

作者:未知 点击:44次 [打印] [关闭] [返回顶部]
本文标签:基于sna 的工程项目进度管理研究 ——以上海d 项目为例
* 由于无法获得联系方式等原因,本网使用的文字及图片的作品报酬未能及时支付,在此深表歉意,请《基于sna 的工程项目进度管理研究 ——以上海d 项目为例》相关权利人与机电之家网取得联系。
关于“基于sna 的工程项目进度管理研究 ——以上海d 项目为例”的更多资讯

电子样本

低噪音变频发电机组
:张利敏
:18996474224
:重庆贝隆机械设备有限公司
个人求购

彭先生 【求购】  石笼网  2024-8-22
陈丽 【求购】  防爆电磁阀  2024-8-22
杨经理 【求购】  勘察表  2024-8-22
陆生 【求购】  蒸汽发生器  2024-8-21
 【求购】  蜂鸣器  2024-8-21
 【求购】  西门子电源...  2024-8-21
刘经理 【求购】  切割机配件  2024-8-21
 【求购】  热源泵  2024-8-21
VIP公司推荐